
Executive project for cable-stayed pedestrian walkway – City of Buenos Aires
Basic and detailed engineering of a cable-stayed metal walkway over Dorrego Avenue
Span between suspension towers: 50 m. Total length: 153 m. Composite concrete-steel structure deck using steel deck and stud connectors. Height of suspension towers: 17 m.
Client: AUSA
Year: 2008



