
Fracture mechanics analysis and structural retrofitting of railway bridge over the Salí river – Tucumán.
Existing bridge, inaugurated in 1889, made of puddled iron. Total length: 560 m, composed of 28 sections of 20 m. Structural reinforcement of the lower chords using a bolted solution as it is a non-weldable material.
Client: PANEDILE / TRENES ARGENTINOS INFRAESTRUCTURA
Year: 2022-2023



