MEP&Co

Fracture mechanics analysis and structural retrofitting of railway bridge over the Salí river – Tucumán.

Existing bridge, inaugurated in 1889, made of puddled iron. Total length: 560 m, composed of 28 sections of 20 m. Structural reinforcement of the lower chords using a bolted solution as it is a non-weldable material.

Client: PANEDILE / TRENES ARGENTINOS INFRAESTRUCTURA
Year: 2022-2023

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top